In the cold chain the real risk is not the bill, it is the stoppage. When cooling stops, stock is lost within hours, and whether a generator will actually start is known on the day it is tested, not the day it is needed.

Get in touch

Continuity

When the profile breaks, something happened

The daily load curve of a cold store is remarkably regular. Cooling packs cycle to a rhythm, door openings cluster at known hours, and the overnight base load barely moves.

That regularity is monitoring’s strongest asset. Overlay the profiles and the one day that diverges is visible at a glance. Divergence is a fault, a door, or a change in operations.

  • Daily profiles drawn on one axis
  • Overnight base load tracked separately
  • The diverging day is flagged automatically

A rising base load usually means the cooling pack is cycling more often. The cause may be a failing door seal or a fouled condenser, and both appear in the profile long before they appear on a bill.

Daily Profiles

7 days overlaid
Schematic: overlapping profiles mean a steady operation. The day that diverges is the one to look at.

Standby power

A generator is trustworthy on the day it is tested

Whether backup power works is only truly known during a real outage, and finding out then is too late. That is why generators are tested on a schedule and every test is recorded.

The panel tracks fuel level continuously and marks tests and refills on the same axis. A warning goes out when the level drops below the refill threshold, and a reminder appears when the gap between tests grows.

  • Fuel level and remaining runtime
  • Test and refill records on one axis
  • Battery, heater and transfer switch status

Remaining capacity is written in hours, not litres. What a site manager needs is not “820 litres in the tank” but “eleven hours at full load”.

Generator Fuel

continuous measurement
refill threshold 50%

41%

Eleven hours at full load; a refill warning goes out below the threshold.

  • last refill · 12 Aug
  • test · 18 Aug
820L
kalan
11h
tam yükte
Schematic: level is measured continuously, with refills and tests marked on the same axis.

Continuity

A whole year in one frame

In the cold chain, continuity is proven by an unbroken record rather than a sentence. “We had five events last year” is a line in a table; the real information is where in the year those events sat and how long the quiet stretches between them ran.

The panel records every day. Seen as a whole year in one frame, the seasonal rhythm, the weekend dips and the clustering of events are read together.

  • Daily cooling load across the full year
  • Faults, services and tests marked separately
  • The same record serves audits and customer reports

Where events cluster is not a coincidence: a fault at the summer peak usually arrives alongside a delayed service. This frame tells you when to bring the maintenance calendar forward.

The Year on Record

365 days · cooling load
JFMAMJJASOND PtÇCP day 1 day 2 day 3 day 4 day 5 day 6 day 7 day 8 day 9 day 10 day 11 day 12 day 13 day 14 day 15 day 16 day 17 day 18 day 19 day 20 day 21 day 22 day 23 day 24 day 25 day 26 day 27 day 28 day 29 day 30 day 31 day 32 day 33 day 34 day 35 day 36 day 37 day 38 day 39 day 40 day 41 10 February · condenser clean day 43 day 44 day 45 day 46 day 47 day 48 day 49 day 50 day 51 day 52 day 53 day 54 day 55 day 56 day 57 day 58 day 59 day 60 day 61 day 62 day 63 day 64 day 65 day 66 day 67 day 68 day 69 day 70 day 71 day 72 day 73 day 74 day 75 day 76 day 77 day 78 day 79 day 80 day 81 day 82 day 83 day 84 day 85 day 86 day 87 day 88 day 89 day 90 day 91 day 92 day 93 day 94 day 95 day 96 day 97 day 98 day 99 day 100 day 101 day 102 day 103 day 104 day 105 day 106 day 107 day 108 day 109 day 110 day 111 day 112 day 113 day 114 day 115 day 116 day 117 day 118 28 April · generator load test day 120 day 121 day 122 day 123 day 124 day 125 day 126 day 127 day 128 day 129 day 130 day 131 day 132 day 133 day 134 day 135 day 136 day 137 day 138 day 139 day 140 day 141 day 142 day 143 day 144 day 145 day 146 day 147 day 148 day 149 day 150 day 151 day 152 day 153 day 154 day 155 day 156 day 157 day 158 day 159 day 160 day 161 day 162 day 163 day 164 day 165 day 166 day 167 day 168 day 169 day 170 day 171 day 172 day 173 day 174 day 175 day 176 day 177 day 178 day 179 day 180 day 181 day 182 day 183 day 184 day 185 day 186 day 187 day 188 day 189 day 190 day 191 day 192 day 193 day 194 day 195 day 196 15 July · cooling pack fault day 198 day 199 day 200 day 201 day 202 day 203 day 204 day 205 day 206 day 207 day 208 day 209 day 210 day 211 day 212 day 213 day 214 day 215 day 216 day 217 day 218 day 219 day 220 day 221 day 222 day 223 day 224 12 August · grid outage day 226 day 227 day 228 day 229 day 230 day 231 day 232 day 233 day 234 day 235 day 236 day 237 day 238 day 239 day 240 day 241 day 242 day 243 day 244 day 245 day 246 day 247 day 248 day 249 day 250 day 251 day 252 day 253 day 254 day 255 day 256 day 257 day 258 day 259 day 260 day 261 day 262 day 263 day 264 day 265 day 266 day 267 day 268 day 269 day 270 day 271 day 272 day 273 day 274 day 275 day 276 day 277 day 278 day 279 day 280 day 281 day 282 day 283 day 284 day 285 day 286 day 287 day 288 15 October · annual service day 290 day 291 day 292 day 293 day 294 day 295 day 296 day 297 day 298 day 299 day 300 day 301 day 302 day 303 day 304 day 305 day 306 day 307 day 308 day 309 day 310 day 311 day 312 day 313 day 314 day 315 day 316 day 317 day 318 day 319 day 320 day 321 day 322 day 323 day 324 day 325 day 326 day 327 day 328 day 329 day 330 day 331 day 332 day 333 day 334 day 335 day 336 day 337 day 338 day 339 day 340 day 341 day 342 day 343 day 344 day 345 day 346 day 347 day 348 day 349 day 350 day 351 day 352 day 353 day 354 day 355 day 356 day 357 day 358 day 359 day 360 day 361 day 362 day 363 day 364 day 365

low load high load 5 marked days

Schematic: each square is a day. Coloured squares are faults, services and tests; the quiet stretches between them are continuity itself.

Control

Charging, lighting and offices move onto a calendar

In a warehouse most loads other than refrigeration can be scheduled: forklift charging points, warehouse and yard lighting, office HVAC, dock heaters.

The remote control module ties those points to the shift calendar and to hourly prices. Charging shifts to the night tariff, yard lighting follows sunset, offices come on with the shift.

  • Charging points scheduled against hourly prices
  • Yard lighting on the solar calendar
  • Refrigeration packs stay out of control, view-only

The cold chain is deliberately outside the control scope. The panel sends no commands to refrigeration packs; their job is to be watched and, when needed, to raise an alarm.

Assistant

You can ask the assistant about the bill too

The most disputed lines on a warehouse bill are capacity overruns and reactive charges. Both result from momentary behaviour, which makes the cause hard to recall once the bill arrives.

The AI assistant makes that connection: it matches the bill line to the measurement record and tells you which day and which half hour produced it.

  • Bill lines matched to the measurement record
  • The hour and the cause arrive together
  • The dispute file comes from the same record

The same assistant works on the cooling side, reading profile breaks, base load creep and alarm history together to say which event actually needs attention.

Assistant

from the measurement record
  1. Where did this month’s capacity charge come from?

  2. Enver

    From a single day: 14 August, 06:15 to 06:45. Average demand in that half hour was 812 kW against a contracted 750 kW. Three loads coincided: refrigeration packs at full load during morning pull-down, forklift charging points that had not left the night schedule, and dock doors opening at shift start. Moving the charging schedule half an hour earlier would have broken the peak, and that rule can be defined on the remote control side.

    • half-hourly demand record
    • control point records
    • capacity line on the bill
Schematic: the assistant ties a bill line to the measurement record and says where the fix belongs.

Which modules work in a warehouse

Module What it does here
Chillers and Cooling Cooling pack efficiency, condenser and tower tracking
Standby Power Fuel, test records, readiness status, monthly report
Energy Consumption Area breakdown, base load, charging station load
Power Quality Voltage dips and outage records
Bill Validation Capacity and reactive line checks
Remote Control Charging, lighting and office schedules; capacity rules
AI Assistant Tying bill lines to measurement, event summaries

When an alert is worth having

In the cold chain an alert earns its value through speed, but a noisy alerting system does more harm than a slow one: within a week nobody looks any more.

That is why thresholds are not single numbers. Dead bands and hysteresis are applied, repeats of the same event are grouped into one notification, and alerts are suppressed during planned shutdowns. The aim is not to report every deviation but to report the one that needs a response, in the first minute.

Frequently asked

Can we catch a refrigeration fault before the temperature drops?

Yes. When the daily power profile of a refrigeration plant breaks — a compressor stuck on load, a shifted defrost pattern, draw outside the profile — a warning is raised while the temperature is still within limits. The temperature alarm is the last line of defence, the profile alarm the first.

How do I know the generator will actually start?

Readiness blockers are checked continuously: controller position, battery, fuel level, pre-heat. Refuelling and tests are recorded; test fuel and outage fuel are accounted separately.

Can we see a whole year at a glance?

Yes. The year map shows every day's consumption in one frame; abnormal days, holiday patterns and seasonal effects are visible without a spreadsheet.

Can charging, lighting and office loads follow a schedule?

Yes. Forklift charging, yard lighting and office climate follow a schedule or the astronomical calendar, and can be shifted on a price signal.

Can we ask the assistant about the bill?

Yes. Enver explains bill lines, the variance and its cause with sources, on the panel or on WhatsApp; the data behind every answer is written beneath it.

Let us measure what is happening on your site.

In a one-hour call we look at your existing setup and set out exactly which measurement points are needed and what you would be able to see.

Get in touch